REF 13404

The objectives of this training are:

  • Reminder of the Basic design of a combined cycle power plants: o Gas Turbine (GT)
  • > Heat Recovery Steam Generator (HRSG)
  • > Steam Turbine (ST)
  • > Condenser & Cooling tower
  • > Pump
  • Notion of thermal efficiency
  • Know the necessary checks and tests to monitor the water quality
  • Build and organize the testing laboratory
  • Conduct measurements and tests
  • Organize inputs and outgoing
  • Organize control laboratory
  • Conduct measurements and tests

The program of this training is the following:

  • Tests and checks required to monitor the quality of water and sewage water
  • Specific equipment for water analysis
  • Organization of measure campaign
  • Management of the equipment
  • Self-monitoring and validation of results
  • Organization of a series of measurements
  • Maintenance of field equipment
  • Management of the consumables
  • Management of inputs and outputs
  • Service organization within the constraints

For more information, please contact info@wlenergy.fr